{"id":1129,"date":"2026-01-19T07:08:41","date_gmt":"2026-01-19T07:08:41","guid":{"rendered":"https:\/\/template01.zehannet.net\/?p=1129"},"modified":"2026-01-19T07:08:42","modified_gmt":"2026-01-19T07:08:42","slug":"whats-the-impact-of-global-chip-shortages-on-pcb-assembly-timelines","status":"publish","type":"post","link":"https:\/\/template01.zehannet.net\/pt\/whats-the-impact-of-global-chip-shortages-on-pcb-assembly-timelines\/","title":{"rendered":"What&#8217;s the impact of global chip shortages on PCB assembly timelines?"},"content":{"rendered":"<div class=\"wp-block-rank-math-toc-block\" id=\"rank-math-toc\"><h2>Table of Contents<\/h2><nav><ul><li><a href=\"#chip-shortages-and-pcb-assembly-lead-time\">Chip shortages and PCB assembly lead time<\/a><\/li><li><a href=\"#component-sourcing-lead-time\">Component sourcing lead time<\/a><ul><li><a href=\"#component-sourcing-becomes-the-main-schedule-driver\">Component sourcing becomes the main schedule driver<\/a><\/li><li><a href=\"#turnkey-outsourced-sourcing-doesn-t-remove-the-risk-it-just-makes-it-visible\">Turnkey\/outsourced sourcing doesn\u2019t remove the risk; it just makes it visible<\/a><\/li><\/ul><\/li><li><a href=\"#microcontroller-lead-time\">Microcontroller lead time<\/a><ul><li><a href=\"#chip-shortages-can-add-months-when-critical-mcus-aren-t-available\">Chip shortages can add months when critical MCUs aren\u2019t available<\/a><\/li><\/ul><\/li><li><a href=\"#bom-alternates-and-redesign\">BOM alternates and redesign<\/a><ul><li><a href=\"#shortages-force-design-and-bom-changes-which-adds-re-spin-and-re-validation-time\">Shortages force design and BOM changes, which adds re-spin and re-validation time<\/a><\/li><\/ul><\/li><li><a href=\"#semiconductor-fab-lead-times\">Semiconductor fab lead times<\/a><ul><li><a href=\"#semiconductor-supply-constraints-can-t-be-fixed-fast-so-lead-time-volatility-persists\">Semiconductor supply constraints can\u2019t be \u201cfixed fast,\u201d so lead-time volatility persists<\/a><\/li><\/ul><\/li><li><a href=\"#procurement-risk-and-line-stoppage\">Procurement risk and line stoppage<\/a><ul><li><a href=\"#procurement-shocks-can-stall-or-halt-assembly-operations-outright\">Procurement shocks can stall or halt assembly operations outright<\/a><\/li><\/ul><\/li><li><a href=\"#supply-chain-domino-effect\">Supply chain domino effect<\/a><ul><li><a href=\"#-domino-effects-propagate-across-the-supply-chain\">\u201cDomino\u201d effects propagate across the supply chain<\/a><\/li><\/ul><\/li><li><a href=\"#evidence-table-you-can-use-in-your-article\">Evidence table you can use in your article<\/a><\/li><li><a href=\"#how-to-protect-your-pcb-assembly-schedule\">How to protect your PCB assembly schedule<\/a><ul><li><a href=\"#use-avl-alternates-before-you-lock-the-bom\">Use AVL + alternates before you lock the BOM<\/a><\/li><li><a href=\"#split-the-build-pilot-run-now-volume-later\">Split the build: pilot run now, volume later<\/a><\/li><li><a href=\"#dfm-and-dft-aren-t-optional-in-shortage-seasons\">DFM and DFT aren\u2019t optional in shortage seasons<\/a><\/li><li><a href=\"#keep-communication-tight-forecast-ncnr-and-kitting-status\">Keep communication tight: forecast, NCNR, and kitting status<\/a><\/li><\/ul><\/li><li><a href=\"#quick-turn-prototyping-and-mass-production-under-shortage-pressure\">Quick-turn prototyping and mass production under shortage pressure<\/a><\/li><\/ul><\/nav><\/div>\n\n\n\n<p>If you\u2019ve ever watched a PCBA schedule fall apart, you already know the punchline: the SMT line isn\u2019t the bottleneck. Parts are.<\/p>\n\n\n\n<p>You can run pick-and-place fast, nail reflow profiles, and pass AOI. Then one MCU, PMIC, or RF chip goes on allocation and your \u201cship date\u201d turns into a moving target. That\u2019s what global chip shortages do to PCB assembly timelines\u2014they shift the whole timeline upstream into sourcing, substitutions, and re-testing.<\/p>\n\n\n\n<p>This matters even more in B2B work. OEM\/ODM programs, EMS builds, design houses, and maintenance teams don\u2019t just need boards. You need predictable lead time, stable quality, and clean documentation from prototype to mass production.<\/p>\n\n\n\n<p>If you\u2019re building with a China-based B2B PCB manufacturer that supports quick-turn prototyping, volume builds, and assembly, you\u2019ll get the most value when you treat supply risk like an engineering input, not a purchasing headache. You can see the full flow on our&nbsp;<a href=\"https:\/\/template01.zehannet.net\/pt\/\">home page<\/a>, and the PCBA scope on our&nbsp;<a href=\"https:\/\/template01.zehannet.net\/pt\/services\/pcb-assembly\/\">PCB assembly service<\/a>.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"720\" src=\"https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/Whats-the-impact-of-global-chip-shortages-on-PCB-assembly-timelines-2.jpg\" alt=\"What&#039;s the impact of global chip shortages on PCB assembly timelines\" class=\"wp-image-1130\" title=\"\" srcset=\"https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/Whats-the-impact-of-global-chip-shortages-on-PCB-assembly-timelines-2.jpg 960w, https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/Whats-the-impact-of-global-chip-shortages-on-PCB-assembly-timelines-2-600x450.jpg 600w, https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/Whats-the-impact-of-global-chip-shortages-on-PCB-assembly-timelines-2-300x225.jpg 300w, https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/Whats-the-impact-of-global-chip-shortages-on-PCB-assembly-timelines-2-768x576.jpg 768w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"chip-shortages-and-pcb-assembly-lead-time\">Chip shortages and PCB assembly lead time<\/h2>\n\n\n\n<p>A typical PCBA timeline looks simple on paper: DFM, fabrication, stencil, SMT, inspection, test, pack-out. In real life, shortages stretch the timeline in three common ways:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>They push \u201cmaterial ready\u201d out by weeks or months.<\/strong><\/li>\n\n\n\n<li><strong>They trigger ECOs (engineering change orders) to swap parts.<\/strong><\/li>\n\n\n\n<li><strong>They create stop-start production, which kills throughput and delivery reliability.<\/strong><\/li>\n<\/ol>\n\n\n\n<p>And yes, this hits both quick-turn prototypes and mass production. Prototypes suffer because you can\u2019t \u201cjust buy 5 pieces\u201d of a constrained chip. Production suffers because allocation limits your monthly output even if your factory capacity is wide open.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"component-sourcing-lead-time\">Component sourcing lead time<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"component-sourcing-becomes-the-main-schedule-driver\">Component sourcing becomes the main schedule driver<\/h3>\n\n\n\n<p>When chips get tight, sourcing becomes the critical path. That changes how you should plan:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Your SMT slot doesn\u2019t matter if your BOM isn\u2019t kitted.<\/li>\n\n\n\n<li>Your fab lead time doesn\u2019t matter if one BGA is missing.<\/li>\n\n\n\n<li>Your delivery promise is only as strong as your weakest part.<\/li>\n<\/ul>\n\n\n\n<p><strong>How it shows up on the ground:<\/strong>&nbsp;a build sits in \u201cwaiting for material\u201d while everything else is ready\u2014stencils, panels, programs, fixtures.<\/p>\n\n\n\n<p><strong>What to do about it:<\/strong>&nbsp;build an AVL (approved vendor list), set alternates early, and keep your assembly partner in the loop before you freeze the BOM. If you\u2019re doing turnkey, align early with your assembler\u2019s procurement team through the&nbsp;<a href=\"https:\/\/template01.zehannet.net\/pt\/services\/\">services overview<\/a>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"turnkey-outsourced-sourcing-doesn-t-remove-the-risk-it-just-makes-it-visible\">Turnkey\/outsourced sourcing doesn\u2019t remove the risk; it just makes it visible<\/h3>\n\n\n\n<p>Turnkey procurement helps because one team owns kitting, substitutions, and traceability. But it won\u2019t magically shorten the lead time of a constrained chip.<\/p>\n\n\n\n<p>In shortage cycles, turnkey procurement usually improves&nbsp;<strong>clarity<\/strong>&nbsp;(what\u2019s available, what\u2019s not, what\u2019s risky). That\u2019s still a win. Clear data lets you choose between:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>waiting,<\/li>\n\n\n\n<li>redesigning,<\/li>\n\n\n\n<li>or splitting builds (build what you can now, then ship the rest later).<\/li>\n<\/ul>\n\n\n\n<p>If you\u2019re deciding between turnkey vs consigned, start with a simple rule:&nbsp;<strong>consign when you already control the supply; turnkey when you need your partner to manage the chaos.<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"720\" src=\"https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/Whats-the-impact-of-global-chip-shortages-on-PCB-assembly-timelines-1.jpg\" alt=\"What&#039;s the impact of global chip shortages on PCB assembly timelines\" class=\"wp-image-1131\" title=\"\" srcset=\"https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/Whats-the-impact-of-global-chip-shortages-on-PCB-assembly-timelines-1.jpg 960w, https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/Whats-the-impact-of-global-chip-shortages-on-PCB-assembly-timelines-1-600x450.jpg 600w, https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/Whats-the-impact-of-global-chip-shortages-on-PCB-assembly-timelines-1-300x225.jpg 300w, https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/Whats-the-impact-of-global-chip-shortages-on-PCB-assembly-timelines-1-768x576.jpg 768w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"microcontroller-lead-time\">Microcontroller lead time<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"chip-shortages-can-add-months-when-critical-mcus-aren-t-available\">Chip shortages can add months when critical MCUs aren\u2019t available<\/h3>\n\n\n\n<p>MCUs and SoCs often sit at the center of the design. When they go unavailable, you don\u2019t just swap one line item. You risk:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>firmware changes,<\/li>\n\n\n\n<li>pinout\/footprint changes,<\/li>\n\n\n\n<li>peripheral mismatches,<\/li>\n\n\n\n<li>new EMI behavior.<\/li>\n<\/ul>\n\n\n\n<p><strong>Real-life scenario:<\/strong>&nbsp;you\u2019re a startup shipping an IoT gateway. You can source passives and most analog parts, but your MCU is constrained. You can either wait, or move to a pin-compatible option and re-qualify. That \u201cre-qualify\u201d step is where weeks disappear.<\/p>\n\n\n\n<p>If your product looks like a controller board, a motion board, or a comms module, you\u2019ll feel this pain fast. That\u2019s why we highlight build types like control boards and module-heavy designs across our&nbsp;<a href=\"https:\/\/template01.zehannet.net\/pt\/products\/\">products<\/a>&nbsp;catalog.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"bom-alternates-and-redesign\">BOM alternates and redesign<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"shortages-force-design-and-bom-changes-which-adds-re-spin-and-re-validation-time\">Shortages force design and BOM changes, which adds re-spin and re-validation time<\/h3>\n\n\n\n<p>Shortages don\u2019t just delay builds. They create extra engineering loops:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>You run an ECO to change an IC.<\/li>\n\n\n\n<li>You update footprints and assembly drawings.<\/li>\n\n\n\n<li>You re-run DFM checks and sometimes impedance rules.<\/li>\n\n\n\n<li>You adjust test limits and fixtures.<\/li>\n\n\n\n<li>You re-do first-article inspection (FAI) and reliability checks.<\/li>\n<\/ul>\n\n\n\n<p>That\u2019s not paperwork. That\u2019s schedule.<\/p>\n\n\n\n<p><strong>Practical tip:<\/strong>&nbsp;don\u2019t wait for purchasing to panic. Put alternates into the BOM at the design stage. A strong DFM review helps you catch land pattern risks, fine-pitch constraints, and rework traps early. If you\u2019re building HDI, RF, or rigid-flex, plan even more margin because \u201csimple swaps\u201d rarely stay simple. Our&nbsp;<a href=\"https:\/\/template01.zehannet.net\/pt\/services\/advanced-pcb\/\">advanced PCB service<\/a>&nbsp;and&nbsp;<a href=\"https:\/\/template01.zehannet.net\/pt\/capabilities\/\">capabilities<\/a>&nbsp;pages give you the manufacturing limits to design around.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"semiconductor-fab-lead-times\">Semiconductor fab lead times<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"semiconductor-supply-constraints-can-t-be-fixed-fast-so-lead-time-volatility-persists\">Semiconductor supply constraints can\u2019t be \u201cfixed fast,\u201d so lead-time volatility persists<\/h3>\n\n\n\n<p>Foundry capacity doesn\u2019t ramp overnight. Shortage cycles often hit \u201clegacy\u201d nodes and specialty processes hard\u2014exactly where a lot of industrial, automotive, and medical designs live.<\/p>\n\n\n\n<p>Translation: even when headlines cool down, you can still see long lead times on specific chips. That\u2019s why schedule planning needs buffers and risk flags per line item, not one blanket \u201clead time\u201d number for the entire BOM.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"procurement-risk-and-line-stoppage\">Procurement risk and line stoppage<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"procurement-shocks-can-stall-or-halt-assembly-operations-outright\">Procurement shocks can stall or halt assembly operations outright<\/h3>\n\n\n\n<p>In a tight market, procurement teams face ugly choices:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>accept partial shipments,<\/li>\n\n\n\n<li>chase broker inventory (and the counterfeit risk that comes with it),<\/li>\n\n\n\n<li>or pause builds.<\/li>\n<\/ul>\n\n\n\n<p>On the factory floor, that looks like line re-sequencing and WIP pileups. For you, it looks like missed delivery dates and awkward customer calls.<\/p>\n\n\n\n<p><strong>What helps:<\/strong>&nbsp;traceability, incoming inspection discipline, and a quality system that doesn\u2019t \u201cwave parts through\u201d just to keep the line moving. If you care about stable output for OEM\/ODM or wholesale volume, anchor your process on strong QC\u2014start with our&nbsp;<a href=\"https:\/\/template01.zehannet.net\/pt\/quality\/\">quality<\/a>&nbsp;approach.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"supply-chain-domino-effect\">Supply chain domino effect<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"-domino-effects-propagate-across-the-supply-chain\">\u201cDomino\u201d effects propagate across the supply chain<\/h3>\n\n\n\n<p>One constrained chip triggers a chain reaction:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>CM can\u2019t kit.<\/li>\n\n\n\n<li>PCBA date slips.<\/li>\n\n\n\n<li>final assembly misses its slot.<\/li>\n\n\n\n<li>logistics gets reprioritized.<\/li>\n\n\n\n<li>your customer changes their forecast again.<\/li>\n<\/ul>\n\n\n\n<p>Then your next build inherits the mess.<\/p>\n\n\n\n<p>This is why experienced EMS teams talk about \u201cline-down parts\u201d and \u201cmaterial readiness\u201d like they\u2019re the true schedule owners. When shortages hit, you win by making your schedule less fragile.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"evidence-table-you-can-use-in-your-article\">Evidence table you can use in your article<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Argument (title)<\/th><th>How it stretches PCBA lead time<\/th><th>Evidence snapshot (lead-time ranges)<\/th><th>Source (name only)<\/th><\/tr><\/thead><tbody><tr><td>Component sourcing becomes the main schedule driver<\/td><td>Parts availability becomes the critical path, not SMT speed<\/td><td>Component sourcing can range from a couple days to several weeks; some chips show multi-week lead times<\/td><td>Wintech PCB Assembly (timeline guide)<\/td><\/tr><tr><td>Chip shortages can add months when critical MCUs aren\u2019t available<\/td><td>Single-point ICs block build release and trigger firmware\/validation work<\/td><td>Shortage conditions can push MCU sourcing out by months<\/td><td>Magellan Circuits (lead-time guide)<\/td><\/tr><tr><td>Turnkey\/outsourced sourcing doesn\u2019t remove the risk; it just makes it visible<\/td><td>Turnkey clarifies risk but still inherits market lead times<\/td><td>Turnkey component sourcing can span from about a week to 12+ weeks in constrained cases<\/td><td>Magellan Circuits (lead-time guide)<\/td><\/tr><tr><td>Shortages force design and BOM changes, which adds re-spin and re-validation time<\/td><td>ECO + re-test cycles add calendar time beyond \u201cwaiting\u201d<\/td><td>Early design review reduces surprises caused by hard-to-find components<\/td><td>PCB Trace (supply constraints discussion)<\/td><\/tr><tr><td>Semiconductor fab lead times can stay long<\/td><td>Capacity constraints create ongoing volatility<\/td><td>Fab lead times can stretch from ~24 weeks to 1+ year for some categories<\/td><td>Rand Tech (shortage analysis)<\/td><\/tr><tr><td>Procurement shocks can stall or halt assembly operations outright<\/td><td>Builds pause or get re-sequenced, hurting delivery reliability<\/td><td>Procurement issues can delay or halt assembly operations<\/td><td>PCB Power (supply chain post)<\/td><\/tr><tr><td>Domino effects propagate across the supply chain<\/td><td>One part delay cascades into multiple downstream slips<\/td><td>Shortages create knock-on delays across dependent components and builds<\/td><td>VSE (supply chain resilience article)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"how-to-protect-your-pcb-assembly-schedule\">How to protect your PCB assembly schedule<\/h2>\n\n\n\n<p>Here\u2019s what works when you don\u2019t want shortages to run your calendar.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"use-avl-alternates-before-you-lock-the-bom\">Use AVL + alternates before you lock the BOM<\/h3>\n\n\n\n<p>Don\u2019t treat alternates as a last-minute patch. Build them into the BOM from day one. If you\u2019re a design studio or a hardware dev service team, this saves you from \u201csurprise redesign\u201d later.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"split-the-build-pilot-run-now-volume-later\">Split the build: pilot run now, volume later<\/h3>\n\n\n\n<p>If you can source enough for a pilot, build it. Validate the process, prove the test, and keep the program moving. Then ramp volume when the line-down parts stabilize.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"dfm-and-dft-aren-t-optional-in-shortage-seasons\">DFM and DFT aren\u2019t optional in shortage seasons<\/h3>\n\n\n\n<p>A clean DFM pass reduces rework risk when you swap parts. Solid DFT (test points, boundary scan readiness, fixture strategy) reduces retest time after an ECO.<\/p>\n\n\n\n<p>If you\u2019re still choosing a manufacturing flow, map it end-to-end:&nbsp;<a href=\"https:\/\/template01.zehannet.net\/pt\/services\/pcb-fabrication\/\">PCB fabrication<\/a>&nbsp;+&nbsp;<a href=\"https:\/\/template01.zehannet.net\/pt\/services\/pcb-assembly\/\">PCB assembly<\/a>&nbsp;+ quality gates. That\u2019s how you keep \u201cquick-turn\u201d from turning into \u201cquick-sand.\u201d<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"keep-communication-tight-forecast-ncnr-and-kitting-status\">Keep communication tight: forecast, NCNR, and kitting status<\/h3>\n\n\n\n<p>Shortages punish silence. Share rolling forecasts, confirm NCNR exposure (non-cancellable, non-returnable parts), and request kitting status updates early.<\/p>\n\n\n\n<p>If you want a clean starting point, send your BOM, Gerbers, assembly drawing, and test notes, then ask for a risk callout list. When you\u2019re ready, use the&nbsp;<a href=\"https:\/\/template01.zehannet.net\/pt\/contact-us\/\">contact page<\/a>&nbsp;to kick off a build review.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"quick-turn-prototyping-and-mass-production-under-shortage-pressure\">Quick-turn prototyping and mass production under shortage pressure<\/h2>\n\n\n\n<p>Shortages don\u2019t mean you should stop building. They mean you should build smarter:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Start with a prototype that\u2019s supply-aware.<\/strong><\/li>\n\n\n\n<li><strong>Choose parts with real availability, not just perfect specs.<\/strong><\/li>\n\n\n\n<li><strong>Lock down process and test early so ECOs don\u2019t wreck your schedule.<\/strong><\/li>\n\n\n\n<li><strong>Use a manufacturer that supports OEM\/ODM, wholesale volume, and strict QC so your ramp doesn\u2019t break.<\/strong><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Global chip shortages don\u2019t just slow PCB\u2014they shift timelines into sourcing, alternates, ECOs, and re-test. Learn how to keep builds on track.<\/p>","protected":false},"author":1,"featured_media":1130,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_gspb_post_css":"","footnotes":""},"categories":[1],"tags":[776,658,777,599],"class_list":["post-1129","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-market-trends","tag-bom-alternates","tag-component-sourcing","tag-ems-manufacturing","tag-pcb-assembly"],"blocksy_meta":[],"_links":{"self":[{"href":"https:\/\/template01.zehannet.net\/pt\/wp-json\/wp\/v2\/posts\/1129","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/template01.zehannet.net\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/template01.zehannet.net\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/template01.zehannet.net\/pt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/template01.zehannet.net\/pt\/wp-json\/wp\/v2\/comments?post=1129"}],"version-history":[{"count":1,"href":"https:\/\/template01.zehannet.net\/pt\/wp-json\/wp\/v2\/posts\/1129\/revisions"}],"predecessor-version":[{"id":1132,"href":"https:\/\/template01.zehannet.net\/pt\/wp-json\/wp\/v2\/posts\/1129\/revisions\/1132"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/template01.zehannet.net\/pt\/wp-json\/wp\/v2\/media\/1130"}],"wp:attachment":[{"href":"https:\/\/template01.zehannet.net\/pt\/wp-json\/wp\/v2\/media?parent=1129"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/template01.zehannet.net\/pt\/wp-json\/wp\/v2\/categories?post=1129"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/template01.zehannet.net\/pt\/wp-json\/wp\/v2\/tags?post=1129"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}