{"id":1098,"date":"2026-01-19T06:25:02","date_gmt":"2026-01-19T06:25:02","guid":{"rendered":"https:\/\/template01.zehannet.net\/?p=1098"},"modified":"2026-01-19T06:25:03","modified_gmt":"2026-01-19T06:25:03","slug":"how-does-component-availability-affect-pcb-design-and-sourcing-strategy","status":"publish","type":"post","link":"https:\/\/template01.zehannet.net\/fr\/how-does-component-availability-affect-pcb-design-and-sourcing-strategy\/","title":{"rendered":"How does component availability affect PCB design and sourcing strategy?"},"content":{"rendered":"<div class=\"wp-block-rank-math-toc-block\" id=\"rank-math-toc\"><h2>Table of Contents<\/h2><nav><ul><li><a href=\"#component-availability-and-lead-time-in-pcb-design\">Component availability and lead time in PCB design<\/a><\/li><li><a href=\"#design-for-supply-chain-and-dfm\">Design for supply chain and DFM<\/a><\/li><li><a href=\"#alternative-parts-and-footprint-strategy\">Alternative parts and footprint strategy<\/a><ul><li><a href=\"#bring-supply-chain-data-into-design-early\">Bring supply chain data into design early<\/a><\/li><li><a href=\"#critical-part-shortages-force-package-and-layout-changes\">Critical part shortages force package and layout changes<\/a><\/li><li><a href=\"#design-for-alternates-with-pin-to-pin-and-footprint-compatible-options\">Design for alternates with pin-to-pin and footprint-compatible options<\/a><\/li><\/ul><\/li><li><a href=\"#bom-management-and-avl-aml-for-sourcing-strategy\">BOM management and AVL\/AML for sourcing strategy<\/a><ul><li><a href=\"#bom-hygiene-turns-into-build-stability\">BOM hygiene turns into build stability<\/a><\/li><\/ul><\/li><li><a href=\"#prototype-vs-mass-production-sourcing\">Prototype vs mass production sourcing<\/a><\/li><li><a href=\"#counterfeit-risk-and-traceability-in-component-sourcing\">Counterfeit risk and traceability in component sourcing<\/a><\/li><li><a href=\"#practical-scenarios-for-oem-odm-and-ems-teams\">Practical scenarios for OEM\/ODM and EMS teams<\/a><\/li><li><a href=\"#argument-table-how-availability-drives-design-and-sourcing-moves\">Argument table: how availability drives design and sourcing moves<\/a><\/li><li><a href=\"#quick-checklist-component-availability-pcb-design-sourcing-strategy\">Quick checklist: component availability, PCB design, sourcing strategy<\/a><\/li><\/ul><\/nav><\/div>\n\n\n\n<p>If you\u2019ve ever had a PCB ready to build but couldn\u2019t ship because one tiny IC went on backorder, you already know the truth:&nbsp;<strong>component availability drives design decisions<\/strong>. It also changes how you build your BOM, how you qualify suppliers, and how you plan ramps from prototype to volume.<\/p>\n\n\n\n<p>As a&nbsp;<strong>China PCB B2B factory: fast prototyping, reliable assembly<\/strong>&nbsp;(<a href=\"https:\/\/template01.zehannet.net\/fr\/\">homepage<\/a>), we see this every week. OEMs, EMS teams, design houses, labs, and startups all hit the same wall. Parts don\u2019t show up on time, and suddenly a \u201csmall change\u201d turns into a respin.<\/p>\n\n\n\n<p>Below are the practical moves that keep your build out of trouble\u2014without turning your design into a compromise.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"720\" src=\"https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/How-does-component-availability-affect-PCB-design-and-sourcing-strategy-1.jpg\" alt=\"How does component availability affect PCB design and sourcing strategy\" class=\"wp-image-1100\" title=\"\" srcset=\"https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/How-does-component-availability-affect-PCB-design-and-sourcing-strategy-1.jpg 960w, https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/How-does-component-availability-affect-PCB-design-and-sourcing-strategy-1-600x450.jpg 600w, https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/How-does-component-availability-affect-PCB-design-and-sourcing-strategy-1-300x225.jpg 300w, https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/How-does-component-availability-affect-PCB-design-and-sourcing-strategy-1-768x576.jpg 768w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"component-availability-and-lead-time-in-pcb-design\">Component availability and lead time in PCB design<\/h2>\n\n\n\n<p>Availability isn\u2019t just a purchasing metric. It changes what you can safely commit to in layout and validation.<\/p>\n\n\n\n<p>Here\u2019s the chain reaction we see most:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A key chip goes long lead time.<\/li>\n\n\n\n<li>You scramble for a substitute.<\/li>\n\n\n\n<li>The substitute has a new package, pinout, thermal pad, or power-up behavior.<\/li>\n\n\n\n<li>Layout shifts, impedance tuning moves, SI\/PI changes, and test points disappear.<\/li>\n\n\n\n<li>Your build schedule slips because you now need re-DFM, re-test, and re-approve.<\/li>\n<\/ul>\n\n\n\n<p>That\u2019s why&nbsp;<strong>availability belongs in the design review<\/strong>, right next to power integrity and DFM.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"design-for-supply-chain-and-dfm\">Design for supply chain and DFM<\/h2>\n\n\n\n<p>Design teams often run DFM checks, but they skip the supply chain version of DFM. Call it&nbsp;<strong>Design for Supply Chain<\/strong>&nbsp;or just \u201cdon\u2019t paint yourself into a corner.\u201d<\/p>\n\n\n\n<p>What this looks like in practice:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Flag\u00a0<strong>single-source<\/strong>\u00a0parts early (connectors, PMICs, RF front-end, specific crystals).<\/li>\n\n\n\n<li>Mark\u00a0<strong>risk parts<\/strong>\u00a0in the schematic (long lead time, allocation history, lifecycle risk).<\/li>\n\n\n\n<li>Keep your PCB stackup and assembly flow flexible, so you can swap packages without blowing up the build.<\/li>\n<\/ul>\n\n\n\n<p>If you\u2019re building for quick-turn + scale, it also helps to align design with your manufacturing flow:&nbsp;<strong>PCB fabrication<\/strong>&nbsp;capabilities, assembly process window, and inspection plan. A one-stop line (prototype \u2192 volume \u2192 PCBA) makes those handoffs cleaner:&nbsp;<a href=\"https:\/\/template01.zehannet.net\/fr\/services\/pcb-fabrication\/\">PCB fabrication<\/a>&nbsp;and&nbsp;<a href=\"https:\/\/template01.zehannet.net\/fr\/services\/pcb-assembly\/\">PCB assembly<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"alternative-parts-and-footprint-strategy\">Alternative parts and footprint strategy<\/h2>\n\n\n\n<p>Shortages don\u2019t announce themselves politely. They show up when you\u2019re trying to lock the build.<\/p>\n\n\n\n<p>So you design like you\u2019ll need alternates\u2014because you might.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"bring-supply-chain-data-into-design-early\">Bring supply chain data into design early<\/h3>\n\n\n\n<p>When you choose a part, you\u2019re also choosing its supply chain behavior. If you only optimize for performance, you may end up with a part that\u2019s always allocated when demand spikes.<\/p>\n\n\n\n<p>A simple habit helps: treat \u201cavailable in volume\u201d as a design requirement, not a purchasing wish.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"critical-part-shortages-force-package-and-layout-changes\">Critical part shortages force package and layout changes<\/h3>\n\n\n\n<p>Some swaps are painless (a resistor value). Others aren\u2019t.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>MCU\/SoC<\/strong>\u00a0swaps can break firmware assumptions and boot straps.<\/li>\n\n\n\n<li><strong>PMIC<\/strong>\u00a0swaps can change sequencing, compensation, and thermal behavior.<\/li>\n\n\n\n<li><strong>Connectors<\/strong>\u00a0can shift keepouts and mechanical alignment.<\/li>\n<\/ul>\n\n\n\n<p>If the alternate isn\u2019t footprint-compatible, you\u2019re looking at a real respin. That\u2019s why you should protect the layout around your most fragile parts.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"design-for-alternates-with-pin-to-pin-and-footprint-compatible-options\">Design for alternates with pin-to-pin and footprint-compatible options<\/h3>\n\n\n\n<p>This is where \u201cfuture you\u201d will thank \u201ctoday you.\u201d<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Prefer\u00a0<strong>pin-to-pin<\/strong>\u00a0families when possible.<\/li>\n\n\n\n<li>Use\u00a0<strong>footprint-compatible<\/strong>\u00a0land patterns that support multiple package variants.<\/li>\n\n\n\n<li>Reserve option pads for common package splits (0603\/0402, SOT-23 variants, etc.).<\/li>\n\n\n\n<li>Keep critical nets routable even if the pin map changes slightly.<\/li>\n<\/ul>\n\n\n\n<p>It won\u2019t cover every case, but it reduces panic when supply tightens.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"720\" src=\"https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/How-does-component-availability-affect-PCB-design-and-sourcing-strategy-2.jpg\" alt=\"How does component availability affect PCB design and sourcing strategy\" class=\"wp-image-1101\" title=\"\" srcset=\"https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/How-does-component-availability-affect-PCB-design-and-sourcing-strategy-2.jpg 960w, https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/How-does-component-availability-affect-PCB-design-and-sourcing-strategy-2-600x450.jpg 600w, https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/How-does-component-availability-affect-PCB-design-and-sourcing-strategy-2-300x225.jpg 300w, https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/How-does-component-availability-affect-PCB-design-and-sourcing-strategy-2-768x576.jpg 768w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"bom-management-and-avl-aml-for-sourcing-strategy\">BOM management and AVL\/AML for sourcing strategy<\/h2>\n\n\n\n<p>If your BOM is messy, sourcing becomes a guessing game. If your BOM is clean, procurement can move fast without risking wrong buys.<\/p>\n\n\n\n<p>This is the backbone:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>MPN discipline<\/strong>: correct manufacturer part number, correct package, correct rating.<\/li>\n\n\n\n<li><strong>AVL\/AML<\/strong>: approved vendor\/manufacturer list, with alternates already reviewed.<\/li>\n\n\n\n<li><strong>Risk tags<\/strong>: long lead time, lifecycle risk, special handling, NCNR exposure.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"bom-hygiene-turns-into-build-stability\">BOM hygiene turns into build stability<\/h3>\n\n\n\n<p>A \u201cworks on my bench\u201d BOM often fails in production because it lacks alternates and clear specs. Your buyer then has to ping engineering for every line item. That\u2019s where schedules die.<\/p>\n\n\n\n<p>Instead, build a BOM that\u2019s&nbsp;<strong>purchase-ready<\/strong>:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>clear part descriptions<\/li>\n\n\n\n<li>acceptable substitutions defined<\/li>\n\n\n\n<li>alternates pre-approved<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"prototype-vs-mass-production-sourcing\">Prototype vs mass production sourcing<\/h2>\n\n\n\n<p>A prototype build and a volume build play by different rules.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Prototype sourcing often prioritizes\u00a0<strong>what\u2019s in stock today<\/strong>.<\/li>\n\n\n\n<li>Volume sourcing prioritizes\u00a0<strong>what stays available<\/strong>\u00a0across months and regions.<\/li>\n<\/ul>\n\n\n\n<p>If you don\u2019t split those mindsets, you risk validating a prototype BOM that can\u2019t scale.<\/p>\n\n\n\n<p>A good approach:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Maintain a\u00a0<strong>prototype BOM<\/strong>\u00a0(fast build, flexible sourcing).<\/li>\n\n\n\n<li>Maintain a\u00a0<strong>production BOM<\/strong>\u00a0(stable supply, alternates qualified, packaging and testing aligned).<\/li>\n<\/ul>\n\n\n\n<p>For teams that want fewer handoffs, it helps to align this with manufacturing planning early through&nbsp;<a href=\"https:\/\/template01.zehannet.net\/fr\/services\/\">Services<\/a>&nbsp;and a clear capability check at&nbsp;<a href=\"https:\/\/template01.zehannet.net\/fr\/capabilities\/\">Capabilities<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"counterfeit-risk-and-traceability-in-component-sourcing\">Counterfeit risk and traceability in component sourcing<\/h2>\n\n\n\n<p>When parts get scarce, gray channels get loud. You\u2019ll hear \u201cwe can get it in three days\u201d right when everyone else can\u2019t.<\/p>\n\n\n\n<p>That\u2019s also when counterfeit risk spikes\u2014especially for high-value ICs.<\/p>\n\n\n\n<p>What experienced teams do:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>lock critical items to traceable channels<\/li>\n\n\n\n<li>require packaging\/lot traceability<\/li>\n\n\n\n<li>run incoming inspection for risk parts<\/li>\n\n\n\n<li>avoid last-minute, unvetted substitutions<\/li>\n<\/ul>\n\n\n\n<p>If your product sits in medical, automotive, industrial control, or anything with field safety exposure, this is non-negotiable. Your quality plan needs to back it up, from IQC to functional test. That\u2019s the point of having a visible process like&nbsp;<a href=\"https:\/\/template01.zehannet.net\/fr\/quality\/\">Quality<\/a>.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"720\" src=\"https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/How-does-component-availability-affect-PCB-design-and-sourcing-strategy-3.jpg\" alt=\"How does component availability affect PCB design and sourcing strategy\" class=\"wp-image-1102\" title=\"\" srcset=\"https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/How-does-component-availability-affect-PCB-design-and-sourcing-strategy-3.jpg 960w, https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/How-does-component-availability-affect-PCB-design-and-sourcing-strategy-3-600x450.jpg 600w, https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/How-does-component-availability-affect-PCB-design-and-sourcing-strategy-3-300x225.jpg 300w, https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/How-does-component-availability-affect-PCB-design-and-sourcing-strategy-3-768x576.jpg 768w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"practical-scenarios-for-oem-odm-and-ems-teams\">Practical scenarios for OEM\/ODM and EMS teams<\/h2>\n\n\n\n<p>Let\u2019s make this real with common build scenes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>IoT gateway \/ smart control board<\/strong>: The RF module gets constrained. A new module shifts keepout and ground strategy, so you re-route RF and re-run EMI checks.<\/li>\n\n\n\n<li><strong>Industrial controller<\/strong>: The preferred MCU goes allocation. You swap to a \u201cclose enough\u201d part, then discover different boot pins and watchdog behavior. Firmware changes land late.<\/li>\n\n\n\n<li><strong>LED power board (MCPCB)<\/strong>: Your driver IC changes package and thermal pad size. Now your copper pour and heat path need rework, not just BOM edits.<\/li>\n<\/ul>\n\n\n\n<p>These aren\u2019t edge cases. They\u2019re normal. The teams that ship treat availability as a design input.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"argument-table-how-availability-drives-design-and-sourcing-moves\">Argument table: how availability drives design and sourcing moves<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Argument (design + sourcing)<\/th><th>What changes in PCB design<\/th><th>What changes in sourcing strategy<\/th><th>Internal source<\/th><\/tr><\/thead><tbody><tr><td>Bring supply chain data into design early<\/td><td>Choose parts with stable supply; reduce single-source risk<\/td><td>Pre-screen risk parts before layout lock<\/td><td><a href=\"https:\/\/template01.zehannet.net\/fr\/capabilities\/\">Capabilities<\/a><\/td><\/tr><tr><td>Critical part shortages force package and layout changes<\/td><td>Footprint, routing, thermal, SI\/PI can shift<\/td><td>Define \u201cacceptable alternate boundary\u201d early<\/td><td><a href=\"https:\/\/template01.zehannet.net\/fr\/services\/pcb-fabrication\/\">PCB fabrication<\/a><\/td><\/tr><tr><td>Design for alternates with footprint-compatible options<\/td><td>Option pads, compatible land patterns, routability buffers<\/td><td>Build AVL\/AML with pre-approved alternates<\/td><td><a href=\"https:\/\/template01.zehannet.net\/fr\/services\/\">Services<\/a><\/td><\/tr><tr><td>BOM management is a multiplier<\/td><td>Cleaner BOM reduces engineering interrupts<\/td><td>Faster purchasing, fewer wrong buys, smoother approvals<\/td><td><a href=\"https:\/\/template01.zehannet.net\/fr\/services\/pcb-assembly\/\">PCB assembly<\/a><\/td><\/tr><tr><td>Prototype vs mass production sourcing logic differs<\/td><td>Validate not just function, but scale readiness<\/td><td>Split prototype BOM vs production BOM<\/td><td><a href=\"https:\/\/template01.zehannet.net\/fr\/products\/\">Products<\/a><\/td><\/tr><tr><td>Shortage pressure raises counterfeit risk<\/td><td>Add test hooks \/ inspection focus for risk parts<\/td><td>Require traceability, incoming checks<\/td><td><a href=\"https:\/\/template01.zehannet.net\/fr\/quality\/\">Quality<\/a><\/td><\/tr><tr><td>Inventory and collaboration mode shapes design<\/td><td>Align design with turnkey\/consigned build flow<\/td><td>Decide turnkey vs consigned early; plan buffers<\/td><td><a href=\"https:\/\/template01.zehannet.net\/fr\/contact-us\/\">Contact us<\/a><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"720\" src=\"https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/How-does-component-availability-affect-PCB-design-and-sourcing-strategy-4.jpg\" alt=\"How does component availability affect PCB design and sourcing strategy\" class=\"wp-image-1099\" title=\"\" srcset=\"https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/How-does-component-availability-affect-PCB-design-and-sourcing-strategy-4.jpg 960w, https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/How-does-component-availability-affect-PCB-design-and-sourcing-strategy-4-600x450.jpg 600w, https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/How-does-component-availability-affect-PCB-design-and-sourcing-strategy-4-300x225.jpg 300w, https:\/\/template01.zehannet.net\/wp-content\/uploads\/2026\/01\/How-does-component-availability-affect-PCB-design-and-sourcing-strategy-4-768x576.jpg 768w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"quick-checklist-component-availability-pcb-design-sourcing-strategy\">Quick checklist: component availability, PCB design, sourcing strategy<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Before schematic freeze<\/strong>: tag single-source parts, set alternate rules, define lifecycle constraints.<\/li>\n\n\n\n<li><strong>Before layout freeze<\/strong>: protect critical footprints, keep routing flexible, plan option pads where it\u2019s realistic.<\/li>\n\n\n\n<li><strong>Before release to build<\/strong>: lock AVL\/AML, clean the BOM, confirm packaging, test strategy, and traceability needs.<\/li>\n\n\n\n<li><strong>Before ramp<\/strong>: separate prototype vs production BOMs, validate substitutes, align build flow with your manufacturing partner.<\/li>\n<\/ul>\n\n\n\n<p>If you want fewer last-minute surprises, treat component availability like you treat EMI: you can\u2019t fix it at the end without paying for it somewhere else.<\/p>","protected":false},"excerpt":{"rendered":"<p>Component availability can make or break your PCB build. Learn how shortages shape footprints, BOM rules, alternates, and sourcing from prototype to volume.<\/p>","protected":false},"author":1,"featured_media":1100,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_gspb_post_css":"","footnotes":""},"categories":[1],"tags":[757,660,756,599,755,672],"class_list":["post-1098","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-market-trends","tag-avl-aml","tag-bom-management","tag-component-availability","tag-pcb-assembly","tag-pcb-design","tag-sourcing-strategy"],"blocksy_meta":[],"_links":{"self":[{"href":"https:\/\/template01.zehannet.net\/fr\/wp-json\/wp\/v2\/posts\/1098","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/template01.zehannet.net\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/template01.zehannet.net\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/template01.zehannet.net\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/template01.zehannet.net\/fr\/wp-json\/wp\/v2\/comments?post=1098"}],"version-history":[{"count":1,"href":"https:\/\/template01.zehannet.net\/fr\/wp-json\/wp\/v2\/posts\/1098\/revisions"}],"predecessor-version":[{"id":1103,"href":"https:\/\/template01.zehannet.net\/fr\/wp-json\/wp\/v2\/posts\/1098\/revisions\/1103"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/template01.zehannet.net\/fr\/wp-json\/wp\/v2\/media\/1100"}],"wp:attachment":[{"href":"https:\/\/template01.zehannet.net\/fr\/wp-json\/wp\/v2\/media?parent=1098"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/template01.zehannet.net\/fr\/wp-json\/wp\/v2\/categories?post=1098"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/template01.zehannet.net\/fr\/wp-json\/wp\/v2\/tags?post=1098"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}